Friday, July 23, 2010

All Clear


The lot was finally cleared on Monday. Cedar and Maple logs piled for milling, red alder for firewood. All brush, stumps and debris removed and a large mound of dirt which had been on the lot was pushed to the front along the ditch. It will later be used to backfill around the front of the house and to create a small berm along the front of the property. Above, Steve loading his excavator and leaving the scene. He'll be back when it's time to dig the foundation.
Below: the lot - before and after.



No comments:

Post a Comment