Monday, December 6, 2010

Progress

The last few weeks have flown by. We continue to make progress knowing that we still have a way to go before the house will be move-in ready. The electricians have finished pulling wire and placing boxes for outlets, fixtures, switches and electronics, R40 insulation has been placed in the ceilings and poly on the walls (the walls were already insulated as part of the Pacific Homes package) and the cedar board and batten siding is almost finished.





The fireplace and woodstove have been installed and the floors are being ground off in the main living area.


The finish on the floor is quite organic and varies from small specs of exposed aggregate to larger pieces in the colours of the rainbow on a dark field. In the sunligh the colours sparkle. The shots below are close-ups, the overall effect much more subdued. We're very happy with it.


Ahead: drywall, paint and kitchen cabinets on the inside and on the outside the septic system, before we can do plumbing. As I was saying, still a ways to go.....

No comments:

Post a Comment